Monday, March 3, 2025
HomeHuskies in the newsISELF building is on the right track in many ways

ISELF building is on the right track in many ways

St. Cloud Times — Good morning, St. Cloud area.

In October 2013, I toured the Integrated Science Engineering Laboratory Facility at St. Cloud State University.

At that time it was full of promise but not too much else. When it opened in September 2013, ISELF took a pretty good beating in some media because it wasn’t filled with activity from Day One. After all, it cost $45 million and was touted as a boon to the university and the region.

On Monday, the editorial board toured the facility with Dan Gregory, dean of the College of Science and Engineering.

Even thought it was the first day of final exams, there was a dramatic change since I toured the facility more than two years ago.

Read more: http://www.sctimes.com/story/opinion/2015/12/19/iself-building-right-track-many-ways/77413312/

University Communications
University Communications
I am a graphic designer at St. Cloud State University and lead art direction and design for Outlook Magazine.
RELATED ARTICLES

Most Popular